This article is directed to interested persons who have not been regularly following the Enercon Case, one the few patent litigation battles which have seen the light of day and is setting new standards in decision making on issues relating to formality rejections and obviousness/inventive step issues. This article puts a quick snapshot of what has happened so far in the contention along with the facts involved in the case:

Introduction Facts:

  1. EG is among the world’s leading wind turbine manufacturers and had set up EIL in 1995 having 56% stake in the company. After company level disputes EIL litigated against EG with as a result retaining control of EIL and Mr. Mehra remaining the Managing Director of the company.
  2. Disputes over certain Licensing agreements led to EIL filing invalidation appeals/revocation petitions at the Intellectual Property Appellate Board for 23 patents (in the name of Mr. Wobben) of EG in Jan 2009. After hearing both parties through October and November, 2010, a bench of the IPAB, consisting of Mr. S. Chandrasekharan sitting as Technical Member and Ms. S. Usha sitting as Judicial Member revoked 12 EG’s patents. Decision of IPAB on the preliminary matters relating to Misc. petitions, dated 27’th July 2010 in which IPAB directed miscellaneous petitions to be considered along with the respective original Revocation applications thereby dismissing the writ petition.
  3. EG made an appeal against this preliminary order of the IPAB, praying for the Madras High Court to issue a writ of certiorari to strike down the impugned order. The issue at discussion was the whether Mr. Yogesh Mehra, MD, of EIL, had the locus standi to maintain the application for revocation. On the one hand, according to the respondent, Mr.Yogesh Mehra relied on a Board resolution dated 27.04.2007, which according to them authorized him to institute suits and proceedings on behalf of the company. This was contraverted by the writ petitioner EG by stating that the resolution dated 27.04.2007 was void and non-est. The Madras High Court relied on the decision by the Hon’ble Supreme Court in the case of M/s. Fomento Resorts and Hotels Ltd. and specifically took note of the fact that when, there is a possibility of appeal all issues have to be taken up and decided. As the facts of the case clearly indicate that there is a definite possibility of appeal against the decision of the Tribunal and the present writ petition itself is one such illustration. Therefore, court ordered that the Tribunal rightly directed miscellaneous petitions to be considered along with the respective Original Revocation Applications thereby dismissing the writ petition.
  4. Substantive disclosures of how the 12 patents were striked down have not been right now made available but one such order was for Patent No. 199045 dated 3’rd December 2010 has been shared by MIPR.
  5. Furthermore, even though issues relating to locus standi were raised by the EG’s counsel which discussed on whether Mr. Mehra could be considered as an interested person, our discussion is strictly on the technical side of patent revocation and not on the legalities relating to authorization of Managing Director who has not been duly authorized by the Board of the Indian Company viz. EIL to sign the revocation application and further his ability also to file the affidavit in respect of the revocation application for the revocation of the subject patent..

Analysis of One Exemplary Patent:

Abstract:

The present invention concerns a wind power installation having a tower head of the wind power installation, comprising a flange for receiving a connection which is suitable for receiving the tower head ,f the wind power installation. Therefore the object of the invention is to provide a tower of a wind power installation having a flange for receiving a connection, wherein the tower does not suffer deformation in respect of its cross-section, in particular in the region of the flange, by virtue of the inherent weight of the tower, during manufacture and/or transport. A tower of a wind power installation for carrying a tower head of the wind power installation, comprising a flange for receiving a connection which is suitable for receiving the tower head of the wind power installation, characterized in that there is provided a partition or a ring bulkhead in the tower interior at a spacing of between preferably 1.0 m and 7.0 m from the flange, and the partition or the ring bulkhead substantially forms a disc which is connected to the tower wall in the tower interior and passes through the tower.

First Independent Claim as granted:

1. A wind power installation having a tower head of the wind power installation, comprising: a tower for supporting the tower head, the tower having an interior and a flange for receiving a connection that is suitable for receiving the tower head of the wind power installation; and a ring bulkhead in the tower interior at a spacing of between 1.0 m and 7.0 m from the flange, wherein the ring bulkhead substantially forms a disc that is connected to an interior wall of the tower.

Reliance was made on US Patent No. 3,761,067 having cited portions Col 1 (Lines 3-5) disclosing cooling towers, Col 1 (Lines 25-30, and Lines 43-44) for giving relation to the same problem that patent under revocation is attempting to provide a solution for, Col 1 (Lines 46-54) and Col 1 Lines 62-65 disclosing stiffening rings for force distribution, wherein the rings are ring or disc shaped.  ‘067 therefore disclosed the proposed inventive step of the subject patent by disclosing a ring structure in the tower, wherein the ring is disc shaped.

It was furthermore stated that a tower having a flange was already admitted by the Applicant of the patent under contention to be existing in the art and hence made part of the Background section of the patent application by stating that “A flange is usually provided at the end of the tower, in the case of the steel towers. That flange forms the flat support surface of the tower for receiving an azimuth mounting, in which respect ball-type rotational connections as are known in the general art are predominantly used as the azimuth mounting. This is shown in Figure 1.” Hence a flange for receiving a connection of a tower head couldn’t be considered as an inventive step.

Reliance was also made on US Patent No. 1,947,515 titled Elevated Tank wherein Page 2 Lines 90-99 was submitted to have disclosed use of a ring 27 which was riveted or welded circumferentially within the tower.

Reliance was also made on US Patent No. 4,261,931 titled “Cooling tower with fluted wall” discloses with cited portion being Col 5, Lines 30-40 wherein horizontal circular rings were disclosed to withstand the compressive loads.

Reliance was also made on US Patent No. 4,010,580 on similar inventive step grounds.  It was also stated that all the above four cited prior art references have not been discussed or been deliberated before in the prosecution for the corresponding patent in other geographies including US, EP, or India and hence the prior arts are valid and should be considered relevant.

It was finally concluded that “Comparing the inventive features in ’067 patent and the inventive features as construed from the principal claim 1, no difference in the invention claimed in the claim of the impugned patent could be perceived or notices.” It was therefore ordered by Mr. S. Chandrasekharan sitting as Technical Member and Ms. S. Usha sitting as Judicial Member that the application for revocation of patent has been allowed.

  1. After having 12 of its patents striked down by IPAB, EG, in Feb 2011, surprisingly filed an appeal before the writ jurisdiction of the Delhi High Court against the Orders of the IPAB striking down 12 patents belonging to Dr. Wobben even though the case would typically have come under the jurisdiction of Madras High Court as IPAB that heard the revocation proceedings was based on Chennai and not in Delhi.
  1. In April 2011, it has also been reported that Enercon GMBH has also filed further writ appeals before the Madras High Court against the Orders of the IPAB revoking several of his patents. The appeals have therefore been filed in both the jurisdictions
  1. In the latest bit of update on the progress of the case, Enercon GMBH filed applications for withdrawal of three of its appeals for counterclaim against 3 of its revoked patents were accepted by the Delhi High Court. As the appeals against the other 9 revoked patents are going on in Madras High Court, it is quite possible that these 3 withdrawn appeals might get filed at the Madras High Court for consistency and other possible reasons.

About the Author: Mr. Tarun Khurana, Partner and Patent Attorney in Institute of Intellectual Property Research & Development (IIPRD) and can be reached: Tarun@iiprd.com.

Leave a Reply

Categories

Archives

  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • September 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • September 2016
  • August 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016
  • January 2016
  • December 2015
  • November 2015
  • October 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • May 2015
  • April 2015
  • March 2015
  • February 2015
  • January 2015
  • December 2014
  • November 2014
  • October 2014
  • September 2014
  • August 2014
  • July 2014
  • June 2014
  • May 2014
  • April 2014
  • March 2014
  • February 2014
  • January 2014
  • December 2013
  • November 2013
  • October 2013
  • September 2013
  • August 2013
  • July 2013
  • June 2013
  • May 2013
  • April 2013
  • March 2013
  • February 2013
  • January 2013
  • December 2012
  • November 2012
  • September 2012
  • August 2012
  • July 2012
  • June 2012
  • May 2012
  • April 2012
  • March 2012
  • February 2012
  • January 2012
  • December 2011
  • November 2011
  • October 2011
  • September 2011
  • August 2011
  • July 2011
  • June 2011
  • May 2011
  • April 2011
  • March 2011
  • February 2011
  • January 2011
  • December 2010
  • September 2010
  • July 2010
  • June 2010
  • May 2010
  • April 2010